The first key deadline required Sunny Farms Landfill LLC to ensure parts of the landfill, not currently accepting waste, were covered with 3 feet of soil by Feb. 28, but an inspection on March 1 by Ohio EPA inspectors found many areas where the facility failed to provide adequate soil cover. from https://mt2indoorfiringrangeservices.tumblr.com/post/183279409554
0 Comments
Leave a Reply. |